Pukekohe Wastewater Treatment Works
Supporting Watercare to upgrade its Pukekohe plant to double its capacity and meet the needs of our growing population
Army Bay Outfall
Part of a $31M contract working with McConnell Dowell for Watercare to Design and Construct a 3km gravity system pipeline and wastewater outfall
Wynard Edge Alliance – America’s Cup
Doing our part to create the stage for the 36th America’s Cup with a fresh Waterfront for Visitors and Kiwi’s
Hastings Outfall Diffuser Upgrade
Installation of a new 300 Metre long diffuser to replace the aging fibreglass system at Hastings WWTW in Clive.
St Mary’s Bay Outfall
A new 2km long pipeline improving water quality by providing for increasing demand on the sewer system and reducing stormwater discharges
Central Interceptor
1.4km of Twin Line 1400mm SDR 13.6 Pipe. The thickest pipe ever welded in New Zealand!